110v Electric stainless steel 100w igniter 10mm waterproof cartridge heater

FOB Reference Price:Get Latest Price
$2.30 - $8.60 / Piece | 1 Piece/Pieces (Min. Order)
Model Number:
6*50mm 6*100mm 6*150mm 6*200mm 8*50mm 8*100mm 8*120mm 8*150mm 8*200mm 10*50mm 10*100mm 10*150mm 10*200mm 10*250mm 12*50mm 12*100mm 12*150mm 12*200mm 14*100mm 14*150mm 14*200mm 14*250mm 16*100mm 16*150mm 16*200mm 16*250mm 16*300mm 18*100mm 18*150mm 18*200mm 18*250mm 18*300mm 20*100mm 20*150mm 20*200mm 20*300mm 20*400mm 20*450mm Shipping fee contact us first
Power(W):
80W and can be customized
Lead Time:
Quantity(Pieces) 1 - 100 101 - 200 201 - 1000 >1000
Est. Time(days) 5 7 10 Negotiable
Customization:
Customized logo (Min. Order: 100 Pieces)
Customized packaging (Min. Order: 100 Pieces)

More

Graphic customization (Min. Order: 100 Pieces) Less
Samples:
$5.00 /Piece | 1 Piece (Min. Order) | Buy Samples
Report Suspicious Activity
Overview
Quick Details
Type:
Air Heater
Power Source:
Electric
Dimension(L*W*H):
packed
Weight:
0.08kg
Warranty:
1 year
Condition:
New
After-sales Service Provided:
Free spare parts, Video technical support, Field installation, commissioning and training, Field maintenance and repair service, Online support
Place of Origin:
Jiangsu, China
Brand Name:
Hongtai
Voltage:
220v and can be customized
Certification:
CE
Applicable Industries:
Hotels, Garment Shops, Building Material Shops, Machinery Repair Shops, Manufacturing Plant, Food & Beverage Factory, Farms, Restaurant, Home Use, Retail, Food Shop, Printing Shops, Construction works , Energy & Mining, Food & Beverage Shops, Advertising Company
Sheath material:
SUS304
Wattage Tolerance:
+5%, -10%
Resistance tolerance:
+10%, -5%
Voltages available:
220V
Max operating temp:
500 C
Length tolerance:
±1 mm
Diameter tolerance:
-0.02mm
Standard Cold Zone:
5-10mm
Insulation resistance (cold):
≥ 500 MΩ
Shape:
straight
Supply Ability
Supply Ability:
1000 Piece/Pieces per Week
Packaging & Delivery
Packaging Details
carton and wooden case for cartridge heater
Port
shanghai
Lead Time :
Quantity(Pieces) 1 - 100 101 - 200 201 - 1000 >1000
Est. Time(days) 5 7 10 To be negotiated
Video Description
cartridge heater
Product Description

Cartridge heaters are manufactured in two basic forms - high density and low density.Cartridge heaters are used to heat plastic injection moulds, dies, platens and so forth, whereas low density cartridge heaters are more suitable for packing machinery, heat sealing, labelling machines and hot stamping applications.

Product Name
 Electric Cartridge Heater
Material
SS304
Resistance wire element
Nickel 80 wire
Wattage density
Not exceeding 30w/cm2 (advisable)
Lead wire type
Crimped or Swaged leads
Worling temerpaterure
650 Deg C max
Length tolerance
+/-1.5%
Diameter tolerance
-0.02 to -0.06 mm
Products Show
Related Products

Finned air heater 

Used for air heating, bank load, air duct heater ,room heater

Liquid heater 

Water heater, oil heater, tank oil heater 

special liquid heater , (acid )

Steam Heater

Flanged heater for water , oil, steam heating

3D printer Cartridge Heater

Used for 3D printer

Coil heater for Nozzle Heater 

Hot runner sysytem heater 

Thermocouple sensor 

Thermocouple , meausure the temperature

Our Service

High quality

Passed the ISO9001:2008 quality system authentication and ROHS authentication.

Effective

Well-trained & experienced Sales team offer best and careful services before and after sales

Fast Shipping

Sample:3-4 days Lead time for the order:10-12working days depend on the quantity

Our Company

Factory

Office 

Sales Team

Engineer Team

Our Certifications
Packing & Delivery

Packaging for Cartridge heater
1) plastic bag + carton for cartridge heater
2) wooden box for cartridge heater


Shipping for cartridge heater
1) shipping by express (sample order) or by sea(bulk order)
2) worldwide shipping service available

Each heater use bubble bag and wrapped first

Choose the right box for the heaters

Exported Wooden case can protect the heaters very well